Busy Supervising
A lego bike lane installed by the Urban Repair Squad in response to the city’s decision to make changes to the Dupont bike lane.

In response to the removal of the Dupont lanes, for the duration of this morning’s rush hour, the squad re-installed a more flexible, modular system of bike lane infrastructure. This installation is proof that building a safe cycling infrastructure is really just child’s play.

This just made my day.

A lego bike lane installed by the Urban Repair Squad in response to the city’s decision to make changes to the Dupont bike lane.

In response to the removal of the Dupont lanes, for the duration of this morning’s rush hour, the squad re-installed a more flexible, modular system of bike lane infrastructure. This installation is proof that building a safe cycling infrastructure is really just child’s play.

This just made my day.

Blog comments powered by Disqus